↖Spruce Run Reservoir
Procurement
2021 Bid Results
2020 Bid Results
2019 Bid Results
2018 Bid Results
2017 Bid Results
2016 Bid Results
2015 Bid Results
2014 Bid Results
2021 Bid Results
2020 Bid Results
2019 Bid Results
2018 Bid Results
2017 Bid Results
2016 Bid Results
2015 Bid Results
2014 Bid Results
Click on the Bid Number to see a full description:
2019 Bid Results
Replacement of Pad Mounted Transformer
|
Earthen Dam Rehabilitation and Ancillary Work
|
Purchase of Bowl Assembly for Vertical Turbine Pump
|
Dredging of Intake Pond
|
Felling of Trees
|
Purchase of Water Treatment Chemicals
|
Replacement of PTAC Through Wall Units
|
Delaware & Raritan Canal Security Video Surveillance and Appurtenant Work
|
Rehabilitation of 6 Mile Run Culvert
|
Stormwater Basins Retrofitting
|
Sediment Removal - Manasquan Reservoir Water Supply System
|
Round Valley Reservoir Electrical Services Upgrades
|
Dredging of Intake Pond and Channel at the South Branch Pumping Station
|
Stormwater Basin Retrofitting
|
Round Valley Reservoir Structures Refurbishment and Resource Preservation Project - Sediment Relocation for Maintenance of the South Tower Intake Channel
|
2019 Manasquan Reservoir Pilot Hydrilla Treatment
|
Purchase of New 2020 6 Wheel, 3 Axle Dump Truck
|
Replacement and Disposal of ~40,000lbs of Granular Activated Carbon - Manasquan Water Treatment Plant
|
Check Valve Replacement and Additional Piping Improvements - Manasquan Water Treatment Plant
|
Spruce Run Fuel Facilities Dispenser Unit Replacement
|
Round Valley Reservoir Structures Refurbishment and Resource Preservation Project - Dam Abutment Grouting
|
Tree Removal - Califon Borough
|
Copyright © 2017